Permit Modification Application

Below you will find the full text of the permit modication application, filed on August 4, 2022. 

 

Notice of Major Modification Application - This was noticed in the Batavia Daily News, the Penny Saver, and mailed to residents within 5 miles of the project boundary. 

 

Major Modification Narrative 

 

Figures 

 

Figure 1 - Facility Layout 

Figure 2 - Layout Comparison 

Figure 3 - Real Property Map of Generating Site and Interconnection Facilities 

Figure 4 - Existing Land Use 

Figure 5 - Tax Parcels Part 1 

Figure 5 - Pax Parcels Part 2 

Figure 6 - Ecological Communities 

Figure 7 - Pre-Construction Avian Survey locations and Coverage 

Figure 8 - Adverse Modification of Estimated Occupied Habitat - REDACTED 

Figure 9 - Wetland and Stream Impacts Part 1

Figure 9 - Wetland and Stream Impacts Part 2 

Figure 9 - Wetland and Stream Impacts Part 3

Figure 10 - Delineated Wetlands and Streams 

Figure 11 - Agricultural Land Use 

Figure 12 - Wind Turbine Setbacks 

 

Attachments 

 

Attachment 1 - Preliminary Design Drawings Part 1 Pages 1-15

Attachment 1 - Preliminary Design Drawings Part 1 Pages 16-30

Attachment 1 - Preliminary Design Drawings Part 2 Pages 31-40

Attachment 1 - Preliminary Design Drawings Part 2 Pages 41-47

Attachment 1 - Preliminary Design Drawings Part 3 Pages 48-58

Attachment 1 - Preliminary Design Drawings Part 3 Pages 59-66

Attachment 1 - Preliminary Design Drawings Part 4 

Attachment 2 - Summary of Local Engagement 

Attachment 3 - Visual Impact Assessment 

Attachment 4 - Shadow Flicker Report Part 1 

Attachment 4 - Shadow Flicker Report Part 2 

Attachment 4 - Shadow Flicker Report Part 3 

Attachment 4 - Shadow Flicker Report Part 4 

Attachment 4 - Shadow Flicker Report Part 5 

Attachment 4 - Shadow Flicker Report Part 6 

Attachment 4 - Shadow Flicker Report Part 7 

Attachment 5 - Preliminary Noise Impact Analysis Addendum REDACTED Part 1 

Attachment 5 - Preliminary Noise Impact Analysis Addendum REDACTED Part 2 

Attachment 5 - Preliminary Noise Impact Analysis Addendum REDACTED Part 3 

Attachment 5 - Preliminary Noise Impact Analysis Addendum REDACTED Part 4 (Pt 1)

Attachment 5 - Preliminary Noise Impact Analysis Addendum REDACTED Part 4 (Pt 2) 

Attachment 5 - Preliminary Noise Impact Analysis Addendum REDACTED Part 5 

Attachment 5 - Preliminary Noise Impact Analysis Addendum REDACTED Part 6 

Attachment 6 - Supplemental Phase 1B Memo REDACTED Part 1

Attachment 6 - Supplemental Phase 1B Memo REDACTED Part 2 

Attachment 6 - Supplemental Phase 1B Memo REDACTED Part 3

Attachment 7 - Supplmental Historic Resources Memo and Response 

Attachment 8 - Wetland and Stream Delineation Report Addendum 

Attachment 9 - Route Evaluation Survey 

Attachment 10 - Stakeholder List