Below you will find the full text of the permit modication application, filed on August 4, 2022.
Notice of Major Modification Application - This was noticed in the Batavia Daily News, the Penny Saver, and mailed to residents within 5 miles of the project boundary.
Figures
Figure 3 - Real Property Map of Generating Site and Interconnection Facilities
Figure 6 - Ecological Communities
Figure 7 - Pre-Construction Avian Survey locations and Coverage
Figure 8 - Adverse Modification of Estimated Occupied Habitat - REDACTED
Figure 9 - Wetland and Stream Impacts Part 1
Figure 9 - Wetland and Stream Impacts Part 2
Figure 9 - Wetland and Stream Impacts Part 3
Figure 10 - Delineated Wetlands and Streams
Figure 11 - Agricultural Land Use
Figure 12 - Wind Turbine Setbacks
Attachments
Attachment 1 - Preliminary Design Drawings Part 1 Pages 1-15
Attachment 1 - Preliminary Design Drawings Part 1 Pages 16-30
Attachment 1 - Preliminary Design Drawings Part 2 Pages 31-40
Attachment 1 - Preliminary Design Drawings Part 2 Pages 41-47
Attachment 1 - Preliminary Design Drawings Part 3 Pages 48-58
Attachment 1 - Preliminary Design Drawings Part 3 Pages 59-66
Attachment 1 - Preliminary Design Drawings Part 4
Attachment 2 - Summary of Local Engagement
Attachment 3 - Visual Impact Assessment
Attachment 4 - Shadow Flicker Report Part 1
Attachment 4 - Shadow Flicker Report Part 2
Attachment 4 - Shadow Flicker Report Part 3
Attachment 4 - Shadow Flicker Report Part 4
Attachment 4 - Shadow Flicker Report Part 5
Attachment 4 - Shadow Flicker Report Part 6
Attachment 4 - Shadow Flicker Report Part 7
Attachment 5 - Preliminary Noise Impact Analysis Addendum REDACTED Part 1
Attachment 5 - Preliminary Noise Impact Analysis Addendum REDACTED Part 2
Attachment 5 - Preliminary Noise Impact Analysis Addendum REDACTED Part 3
Attachment 5 - Preliminary Noise Impact Analysis Addendum REDACTED Part 4 (Pt 1)
Attachment 5 - Preliminary Noise Impact Analysis Addendum REDACTED Part 4 (Pt 2)
Attachment 5 - Preliminary Noise Impact Analysis Addendum REDACTED Part 5
Attachment 5 - Preliminary Noise Impact Analysis Addendum REDACTED Part 6
Attachment 6 - Supplemental Phase 1B Memo REDACTED Part 1
Attachment 6 - Supplemental Phase 1B Memo REDACTED Part 2
Attachment 6 - Supplemental Phase 1B Memo REDACTED Part 3
Attachment 7 - Supplmental Historic Resources Memo and Response
Attachment 8 - Wetland and Stream Delineation Report Addendum
Attachment 9 - Route Evaluation Survey
Attachment 10 - Stakeholder List